Client: University of New South Wales
Location: Randwick
Value: $2 million

Description of Works

The Lower Campus Development, Stage 1 involved the demolition and removal of two buildings, the relocation of existing services, installation of new services, the construction of new stormwater drains and the construction of a new road and footpath. Incorporated within the new road is street lighting and kerb inlet pits for the stormwater.

North Shore Paving was able to expertly manage this complex infrastructure project and the relocation of the existing services allowed for the construction of a future buildings in the area.

Key Features

Asphaltic concrete road pavement
Concrete kerb and gutter
Concrete footpaths, with segmental pavers
Extensive service relocation, upgrade and new construction including;
Gas services
Piped stormwater drainage system
Potable cold water
Treated and untreated bore water
Grey water system
Sewer pump out system
Hydraulic and fire services
High and low voltage services
Light poles and luminaries