Client: Deleg8
Location: Minchinbury
Value: $150,000

Description of Works

North Shore Paving was contracted by Deleg8 to construct a new road within the Pinegrove Memorial Park. The scope of works for the new 180m road included; full depth pavement with a subbase and base course layer, concrete kerbs, 7mm primer seal, asphalt wearing course, subsoil drainage and line marking.

Key Features

  • Concrete kerbs and dish drain construction
  • 7mm primer seal
  • Full depth asphalt pavement construction
  • Asphalt wearing course
  • Line marking
  • Subsoil drainage installed