Key Features
- Effective safety management of a sensitive site (active hospital)
- Removal of granite pavers
- Excavation and disposal of existing paver bedding material
- Preparation of joints with primer and BITAC jointing
- Deep lift asphalt pavement
- Installation of thermoplastic linemarking; parking spaces and pedestrian crossings
- Tactile installation
Description of Works
This 650m2 project at Blacktown Hospital included; demolition of existing damaged pavers, an extensive clean of the underlying concrete slab, application of jointing tape, deeplift asphalt pavement and linemarking.
North Shore Paving utilised BITAC jointing on the existing concrete slab joints prior to asphalting.
After the application of the tack coat, the asphalt crew installed the deeplift asphalt layer followed by the wearing course. The time sensitive nature of the project was also respected, with work completed in a timely and effective manner.