UNSW Lower Campus Development

Client                                      Value

University of New South Wales                  $2 million

Description of Works

The Lower Campus Development, Stage 1 involved the demolition and removal of two buildings, the relocation of existing services, installation of new services, the construction of new stormwater drains and the construction of a new road. Incorporated within the new road is street lighting and kerb inlet pits for the stormwater. Relocation of the existing services will allow for the construction of a future building.

Key Features

  • Asphaltic concrete road pavement
  • Concrete kerb and gutter
  • Concrete footpaths, with segmental pavers
  • Gas services
  • Piped stormwater drainage system
  • Potable cold water
  • Treated and untreated bore water
  • Grey water system
  • Sewer pump out system
  • Hydraulic and fire services
  • High and low voltage services
  • Light poles and luminaries